Back to main site

Complex Development of Mezhdurechensk-Tayshet Section of the Krasnoyarsk Railway. Construction of Side Tracks at Jeb-Shchetinkino Haul

Construction sites are located at Jeb-Shchetinkino haul.

The project makes provisions for 3 construction stages:

Stage 1 — reconstruction of Jeb Station. Construction of the second track from Jeb Station to the 2nd Jeb tunnel;

Stage 2 — Construction of the second track from the second Jeb tunnel to the block post at 602 km before Kozinsk tunnel;

Stage 3 — Construction of the second track from the block post at 602 km to Shchetinkino Station.